Identifying and Aligning Circular Construction Information with Level of Information Needs (LOIN) in Building Information Modeling (BIM)-based Workflows: A Case Study for Structural Elements
280 Downloads
Last Updated: 4-2026
The transition towards a circular economy in the construction industry is critically dependent on the availability of standardized, machine-readable, and interoperable digital information. While international standards like the Level of Information Need (LOIN) framework and openBIM standards such as the buildingSMART Data Dictionary (bSDD) and the Information Delivery Specification (IDS) provide a foundation for structured data exchange, a clear methodology for their integrated application to support component reuse and deconstruction is largely missing. This research addresses this gap by developing and validating a standards-based workflow for embedding circularity data into BIM models, with a specific focus on structural elements.
A mixed-method approach was employed, combining a systematic literature review with semi-structured expert interviews to identify a consolidated list of properties for decommissioning and reuse. These properties were then structured into a formal Exchange Information Requirement (EIR) table, meticulously aligned with the LOIN framework to define their purpose, responsible actor, and delivery milestone. This EIR was subsequently applied to a real-world case study BIM model. The workflow demonstrated the enrichment of an Industry Foundation Classes (IFC) model with circularity properties, mapped to the bSDD where possible, and its subsequent validation using an automatically generated IDS file.
The results confirm the technical feasibility of aligning circularity data with the LOIN framework using existing standards. The study successfully demonstrates an end-to-end process from requirement definition to a validated BIM model, ensuring that critical knowledge for future reuse is captured. However, the findings also reveal significant gaps in current standards, with a large portion of the identified practice-based properties lacking formal definitions in IFC or the bSDD. This research contributes a reproducible, standards-compliant workflow that bridges the gap between conceptual frameworks and operational BIM processes.
